HK GROUP INVESTMENTCorporate film ▷

BESANTAŞ IN MAJOR INFRASTRUCTURE

Halkalı–Kapıkule
High-Speed Rail Project.

Ready-mix concrete supply for the Ispartakule–Çerkezköy section.

Project
Halkalı–Kapıkule High-Speed Rail Project
Section we serve
Ispartakule–Çerkezköy
Contractor
Gülermak–YSE Joint Venture
Our contribution
Ready-mix concrete supply
Train passing on the Çerkezköy–Kapıkule section of the Halkalı–Kapıkule project

OUR CONTRIBUTION

Part of a
major connection.

Besantaş supplies ready-mix concrete for the Ispartakule–Çerkezköy section of the Halkalı–Kapıkule High-Speed Rail Project.

  1. 01

    THE WIDER PROJECT

    From Halkalı to Kapıkule.

    The Halkalı–Kapıkule High-Speed Rail Project is a major transport investment connecting Istanbul to Europe’s rail network through Thrace. Halkalı–Ispartakule, Ispartakule–Çerkezköy and Çerkezköy–Kapıkule are separate sections of this connection.

  2. 02

    THE SECTION WE SERVE

    Ispartakule–Çerkezköy.

    Our ready-mix concrete supply covers the Ispartakule–Çerkezköy section. This reference reflects our concrete supply experience in major transport infrastructure projects.

  3. 03

    PROJECT VIEWS

    Engineering along the route.

    Infrastructure works on the Ispartakule–Çerkezköy section reveal the scale of the project on site.

PROJECT SCALE

The project in numbers.

Ispartakule–Çerkezköy section length
69 km
Design speed
200 km/h
Number of tracks
Double track

The length refers to the Ispartakule–Çerkezköy section; the speed is the line’s design speed.

FROM PRODUCTION TO SITE

Ready-mix concrete supporting major projects.

Our production and fleetOther project references